Dismantling of BBs:
Preparation of site where BBs are to be installed.
Removal of all supporting wires and other connections.
Collection of Batteries, wires, connectors and rack material and transportation.
Erection:
Planning and complete pre-erection activities.
Preparation of site for the new Battery Bank including dismantling of old Battery Bank.
Preparation of a plan for the implementation of erection work.
Providing installation plans, coordinating the transfer of material to the site.
Testing:
Prepare the battery, measure and record data on no-load.
Testing as per industry standards, regulations, and guidelines or as per customer’s test recommendations.
Collation of test data and records for customer’s satisfaction.
Commissioning:
Pre-startup and installation checks/verification steps to ensure the proper installation and reliable operation of a battery system.
Conducting load test as per specification or customer’s guidelines and specifications.
Collation of data and records and submission.